Rock wool board for external wall insulation, as an inorganic rock wool material for external wall insulation that has reached fire rating A, has been widely used. Today I'd like to introduce the preparations and conditions before using rock wool board.
施工前準(zhǔn)備:
Preparation before construction:
1.施工前,應(yīng)根據(jù)設(shè)計和本規(guī)程要求以及相關(guān)的技術(shù)標(biāo)準(zhǔn)編制針對工程項目的節(jié)能保溫專項施工方案,并應(yīng)對施工人員進(jìn)行技術(shù)交底和專業(yè)技術(shù)培訓(xùn)。
1. Before construction, the special construction scheme for energy conservation and insulation of the project shall be prepared according to the requirements of the design, this specification and relevant technical standards, and the construction personnel shall be provided with technical disclosure and professional technical training.
2.巖棉板外保溫系統(tǒng)用于節(jié)能保溫工程的施工應(yīng)按照經(jīng)審查合格的施工圖設(shè)計文件和經(jīng)審批通過的用于工程項目的節(jié)能保溫專項施工方案進(jìn)行。
2. The construction of rock wool board external insulation system used in energy-saving and insulation projects shall be carried out in accordance with the reviewed and qualified construction drawing design documents and the approved special construction scheme for energy-saving and insulation for engineering projects.
3.巖棉板外保溫系統(tǒng)的生產(chǎn)企業(yè)應(yīng)有專業(yè)人員在施工過程中進(jìn)行現(xiàn)場指導(dǎo),并配合施工單位和現(xiàn)場監(jiān)理做好施工質(zhì)量控制工作。
3. The production enterprise of rock wool board external insulation system should have professionals to provide on-site guidance during the construction process, and cooperate with the construction unit and on-site supervisor to do a good job of construction quality control.
4.材料進(jìn)場須按規(guī)格,數(shù)量和質(zhì)量要求經(jīng)過驗收合格才能入庫,并應(yīng)有專人保管,嚴(yán)禁露天堆放。幕墻巖棉板應(yīng)架空防潮堆放。
4. Materials entering the site must pass the acceptance according to the specification, quantity and quality requirements before entering the warehouse, and should be kept by a specially assigned person. It is strictly prohibited to stack in the open air. The rock wool board of curtain wall shall be stacked overhead against moisture.
Jinan rock wool board construction should meet the following conditions:
1.基層墻體及其水泥砂漿找平層處理及預(yù)埋件安裝完畢。
1. The treatment of base wall and its cement mortar leveling layer and the installation of embedded parts are completed.
2.必要的施工機具和勞防用品應(yīng)已準(zhǔn)備齊全。
2. Necessary construction machines and tools and labor protection supplies should be prepared.
3.施工專用腳手架應(yīng)搭設(shè)牢固,安全檢驗合格。腳手架立桿與水平桿與墻面,墻角的間距應(yīng)滿足施工要求。
3. Special scaffolds for construction shall be erected firmly and pass the safety inspection. The spacing between the upright and horizontal poles of the scaffold and the wall and the corner of the wall shall meet the construction requirements.
4.基層墻體應(yīng)堅實平整,表面干燥,不得有開裂,空鼓,松動或泛堿,水泥砂漿找平層的粘結(jié)強度,平整度及垂直度應(yīng)符合(建筑裝飾裝修工程質(zhì)量驗收規(guī)范)GB50210中普通抹灰工程質(zhì)量的要求。
4. The base wall shall be solid and flat, and the surface shall be dry, without cracking, hollowing, loosening or alkali flashing. The bonding strength, flatness and perpendicularity of the cement mortar leveling layer shall meet the requirements for the quality of ordinary plastering engineering in gb50210 (code for quality acceptance of Building Decoration Engineering).
What are the preparation and conditions for rock wool board before use? The above is the answer for you. If you need to buy or customize, please come to our website http://m.plisse.cn Consult.