亚洲一区播放,波多野结衣被躁,中日韩高清在线观看的,三上悠亚免费视频

從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
服務(wù)電話:0531-83658718
熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
行業(yè)資訊 所在位置- 首頁-新聞中心-行業(yè)資訊石膏復(fù)合板的安裝要注意什么?

石膏復(fù)合板的安裝要注意什么?

發(fā)布時間:2022-02-15 來源:http://m.plisse.cn/

我們又可以稱之為是硅鈣板。石膏復(fù)合板是一種較常見的保溫材料,被廣泛的應(yīng)用于室內(nèi)隔墻保溫。但是你知道石膏復(fù)合板隔墻保溫施工流程都包含了哪些嗎?
We can also call it silicon calcium board. Gypsum composite board is a common thermal insulation material, which is widely used in indoor partition insulation. But do you know what is included in the construction process of gypsum composite board partition insulation?
墻位放線:按照設(shè)計(jì)圖紙?jiān)跇堑孛妗γ?、頂面和主體結(jié)構(gòu)墻面彈出定位線和邊線,并彈出門窗口線。墻基施工:墻基施工前,樓地面應(yīng)進(jìn)行毛化處理,并涂刷固央墻地界面寶,現(xiàn)澆墻基混凝土。
Wall setting out: snap positioning lines and sidelines on the floor, wall, top and main structure wall according to the design drawings, and snap the door and window opening lines. Wall foundation construction: before the construction of wall foundation, the floor shall be roughened, painted with solid central wall ground interface, and cast-in-situ wall foundation concrete.
濟(jì)南泡沫復(fù)合板
預(yù)排:量準(zhǔn)隔墻凈空高度、寬度及門窗口尺寸,在地面上進(jìn)行預(yù)排列。設(shè)有門窗的隔墻,應(yīng)先安裝窗口上、下和門上的短板,再順序安裝門窗口兩側(cè)的隔墻板,如剩余墻寬不足整板時,則按實(shí)際墻寬補(bǔ)板。
Pre arrangement: measure the clearance height and width of the partition wall and the size of the door and window, and pre arrange it on the ground. For the partition wall with doors and windows, the short plates on the upper, lower and door of the window shall be installed first, and then the partition plates on both sides of the door and window shall be installed in sequence. If the remaining wall width is less than the whole plate, the plate shall be supplemented according to the actual wall width.
安裝:石膏復(fù)合板安裝時,在板的頂面、側(cè)面和板與板之間,均勻涂抹一層膠黏劑,然后上下頂緊,側(cè)面要嚴(yán)實(shí),縫內(nèi)膠黏劑要飽滿。板下所塞木楔,一般不撤除,但不得露出墻外。首塊石膏復(fù)合板安裝好后,要檢查其垂直度,繼續(xù)安裝時,須上,下橫靠檢查尺,開與板面找平當(dāng)板面不平時,應(yīng)及時糾正復(fù)合板與兩端主體結(jié)構(gòu)連接要牢固。
Installation: during the installation of gypsum composite board, apply a layer of adhesive evenly on the top and side of the board and between the board and the board, and then press it up and down. The side should be tight and the adhesive in the joint should be full. The wooden wedge under the slab shall not be removed generally, but shall not be exposed outside the wall. After the first gypsum composite board is installed, its perpendicularity shall be checked. When continuing the installation, it must lean against the inspection ruler up and down, open and level with the board surface. When the board surface is uneven, it shall be corrected in time, and the connection between the composite board and the main structure at both ends shall be firm.
以上就是今天帶給大家的知識濟(jì)南泡沫復(fù)合板專注行業(yè)多年,為用戶不斷的提供有價(jià)值的內(nèi)容,更多內(nèi)容請繼續(xù)關(guān)注我們:http://m.plisse.cn
The above is the knowledge that we bring to you today. Ji'nan foam composite board has been focusing on the industry for many years, providing users with valuable content continuously. http://m.plisse.cn