濟(jì)南巖棉泡沫板為你講解閉孔泡沫板安裝順序

發(fā)布時(shí)間:2020-10-23 來(lái)源:http://m.plisse.cn/

1、閉孔泡沫板切割:用電熱絲切割器或其他專(zhuān)用工具切割,對(duì)角線(xiàn)誤差±2mm,按實(shí)際需要的尺寸加工。尺寸允許偏差為±2mm,大小面垂直。

1, cutting of closed cell foam board: cutting with hot wire cutter or other special tools, diagonal error of + 2mm, processing according to actual size. The vertical dimension is ± 2mm.

2、粘接劑配制:按配合比用電動(dòng)攪拌器配制粘結(jié)砂漿,一次配制量以45分鐘內(nèi)用完為宜。

2. Preparation of adhesive: prepare adhesive mortar with electric mixer according to the mix proportion, and it is appropriate to use up the mortar within 45 minutes at a time.

3、變形縫線(xiàn)兩側(cè)的閉孔泡沫板上預(yù)貼250mm寬包底網(wǎng)格布。

3. 250mm wide package bottom grid cloth is pre applied on the closed cell foam board on both sides of the deformation suture.

4、在閉孔泡沫板板面四周涂抹一圈粘接劑,寬50mm,厚10mm,側(cè)面留30mmX50mm寬排氣口;板心按梅花形布設(shè)粘接點(diǎn),間距150mm-200mm,直徑100mm。粘接砂漿的涂抹面積與閉孔泡沫板面積之比首層不小于40%,其他樓層不小于30%。抹完粘接劑后,立即將板立起就位粘貼,粘貼時(shí)應(yīng)輕揉、均勻擠壓,并隨時(shí)用托線(xiàn)板檢查垂直平整。板與板擠緊,碰頭縫處不抹粘接劑。粘貼閉孔泡沫板應(yīng)做到上下錯(cuò)縫,每貼完一塊板,應(yīng)及時(shí)清除擠出的粘接劑,板面不留間隙,如出現(xiàn)間隙,應(yīng)用相應(yīng)寬度的閉孔泡沫板填塞。

4. Apply a circle of adhesive around the closed cell foam board. The width is 50mm, the thickness is 10mm, and the width of the 30mmX50mm is wide at the side. The center of the board is set up by the plum blossom shape, the spacing is 150mm-200mm, and the diameter is 100mm. The ratio of bonding area to the area of closed cell foam board is not less than 40%, and the other floor is not less than 30%. After plastering the adhesive, the Board shall be erected immediately and pasted in place. When pasting, it shall be gently kneaded and evenly squeezed, and the vertical flatness shall be checked with the line supporting board at any time. The plates shall be squeezed tightly, and no adhesive shall be applied at the joint. Paste the closed cell foam board should be up and down the wrong seam, each paste a piece of board, should promptly remove the extrusion adhesive, no gaps on the board surface, if there is a gap, the corresponding width of closed foam board stuffing.


2-201023163202344.jpg

6、在外墻轉(zhuǎn)角部位,上下排閉孔泡沫板間的豎向縫應(yīng)為垂直交錯(cuò)連接,保證板材安裝的垂直度。

6. In the corner of the external wall, vertical joints between the upper and lower rows of closed foam plates should be vertically interlaced to ensure the perpendicularity of the plate installation.

7、閉孔泡沫板接縫不平處應(yīng)用粗砂紙或其他打磨工具磨平,然后再將整個(gè)閉孔泡沫板打磨一遍,粗砂紙應(yīng)襯有平整板材,打磨動(dòng)作宜為輕柔的圓周運(yùn)動(dòng),磨平后應(yīng)用刷子或壓縮空氣將碎屑清理干凈。

7. The flat joints of the closed foam board should be grinded with coarse sand paper or other grinding tools, then the entire closed cell foam board will be ground again. The coarse sand paper should be lined with flat sheets, and the grinding action should be gentle circular motion. After grinding, clean the crumbs with brush or compressed air.

8、若設(shè)計(jì)有要求,可在閉孔泡沫板上拉出裝飾縫。

8, if the design is required, the decorative seam can be pulled out on the closed cell foam board.

安裝固定件:(高層或中層用)在貼好的閉孔泡沫板上用沖擊鉆鉆孔,孔洞深入墻基面不小于30mm,數(shù)量為每平米4-5個(gè),但每一單塊閉孔泡沫板不少于1個(gè),用ф8-ф10聚乙烯脹塞把閉孔泡沫板固定在墻體上,木螺絲擰到與閉孔泡沫板面平。

Installation of fixings: (upper or middle level) drilling with a percussive drill on a well closed foam board. The hole is deeper than the base of the wall, not less than 30mm, the quantity is 4-5 per square meter, but there are not less than 1 closed cell foam plates for each single block. The closed cell foam board is fixed on the wall with the 8- 8- 10 polyethylene expansion plug, and the wooden screw is screwed to the flat surface with the closed cell foam board.