1、樓承板在裝、卸、安裝中嚴(yán)禁用鋼絲繩捆綁直接起吊,運(yùn)輸及堆放應(yīng)有足夠支點(diǎn),以防變形。
1. During the loading, unloading and installation of the floor bearing plate, it is strictly forbidden to use steel wire rope to bind and lift directly. The transportation and stacking shall have sufficient supporting points to prevent deformation.
2、鋪設(shè)前對(duì)彎曲變形的樓承板應(yīng)校正好。
2. The bent and deformed floor bearing plate shall be aligned before laying.
3、功能樓層鋼梁頂面要保持清潔,嚴(yán)防潮濕及涂刷油漆未干。
3. The top surface of the steel beam on the functional floor shall be kept clean and strictly protected from moisture and wet paint.
4、下料、切孔采用等離子切割機(jī)進(jìn)行切割,嚴(yán)禁用氧氣乙炔火焰切割。大孔洞四周應(yīng)補(bǔ)強(qiáng)。
4. Blanking and hole cutting shall be conducted by plasma cutting machine, and oxygen acetylene flame cutting is strictly prohibited. Reinforce around large holes.
5、支頂架拆除應(yīng)待混凝土達(dá)到一定強(qiáng)度后方可拆除。
5. The roof support shall be removed after the concrete reaches a certain strength.
6、
濟(jì)南樓承板按圖紙放線安裝、調(diào)直、壓實(shí)并點(diǎn)焊牢靠。
6. Jinan floor bearing plate shall be set out, installed, straightened, compacted and firmly welded according to the drawing.
7、樓承板鋪設(shè)完畢、調(diào)直固定后應(yīng)及時(shí)用鎖口機(jī)具進(jìn)行鎖口,防止由于堆放施工材料和人員交通造成壓型板咬口分離。
7. After the floor bearing plate is laid, straightened and fixed, it shall be locked with a locking machine in time to prevent the separation of the profiled plate bite due to the stacking of construction materials and personnel traffic.
8、安裝完畢,及時(shí)清掃施工垃圾,剪切下來的邊角料應(yīng)收集到地面上集中堆放。
8. After the installation, the construction waste shall be cleaned in time, and the cut leftovers shall be collected on the ground for centralized stacking.
9、加強(qiáng)成品保護(hù),鋪設(shè)人員交通馬道,減少人員在樓承板上不必要的走動(dòng),嚴(yán)禁在樓承板上堆放重物。
9. Strengthen the protection of finished products, lay personnel traffic berms, reduce unnecessary movement of personnel on the floor bearing plate, and prohibit stacking heavy objects on the floor bearing plate.
此外在進(jìn)行吊運(yùn)的時(shí)候應(yīng)當(dāng)采用專用的軟吊索,在每次工作前都應(yīng)該檢查吊索的情況,是否有隔斷以及撕裂的情況,如果有應(yīng)當(dāng)立馬更換。更多相關(guān)內(nèi)容就來我們網(wǎng)站
http://m.plisse.cn咨詢了解吧!
In addition, special soft slings should be used for lifting. Before each work, the condition of slings should be checked to see if there are partitions and tears. If there are any, they should be replaced immediately. Come to our website for more relevant content http://m.plisse.cn Ask about it!